Ranger Valve America

Technical Guide

How does a lean supply chain lower the cost of valves?

The short answer

Every warehouse, branch and layer of staff between a factory and a buyer is paid for in the price of the valve. RANGER supplies valves factory-direct from FZV, without a network of branches or warehouses of its own in North America, so that overhead is not built into the price. The saving is greatest for project orders and for buyers who hold inventory, because they stop paying for facilities and stock that someone else carries.

Ranger Valve America Ltd. · Last reviewed

Where the price of a valve comes from

Two valves made to the same standard in the same quality of material can reach the buyer at different prices. The manufacturing cost is only part of it: the rest is what it costs to move the valve to the buyer, and how many facilities and people it passes through on the way.

Cost layerBranch and warehouse supplyRANGER factory-direct supply
Manufacturing: material, machining, testing, qualityIn the priceIn the price
Packing, freight, duties and logisticsIn the priceIn the price. Quoted Ex Works or landed
Regional branches and warehouses: rent, utilities, insurance, staffRecovered through the price of every valveNot carried: RANGER has no branch or warehouse network in North America
Stock held on the shelf: capital, handling, damage, obsolescencePriced in, whether or not the buyer's item is the one that sellsNot priced in: valves are built to order, with component stock held at the factory for popular configurations
Additional margin on each layer of resaleAdded at each layerFewer layers between the factory and the buyer

What lean overhead means in practice

  • No bricks and mortar: no North American branches, warehouses or showrooms whose costs have to be recovered in the price of the valve.
  • Quotations are built from the factory up: RANGER confirms price, lead time and special requirements with the manufacturing facility, so the quotation reflects what the factory will actually build.
  • Component stock is held at the factory to shorten lead times on popular configurations, instead of finished valves held on regional shelves.
  • Support runs on partners: local distribution partners provide inventory and parts support where customers want local stock, repair and fabrication partners provide local services, and a US-based customs and logistics team oversees each delivery.

Who benefits most

  • Project orders

    Valves built to a data sheet for a defined project are made to order. A buyer who is not paying for a distributor's warehouse, stock and facilities pays for the valve, and not for the infrastructure around it.

  • Inventory programs

    Companies that hold stock, or pay a distributor to hold it for them, carry the cost of capital, storage and obsolescence. Faster replenishment from the factory lets the buyer hold less, as described in valve lead times and inventory turns.

  • Turnaround and maintenance spares

    Planned spares can be ordered to a schedule instead of bought off a shelf, with the savings from lower overhead applied to the whole order.

Compare suppliers on total cost, not unit price

A lower overhead should show up in the quotation, but the comparison is only fair if both quotations cover the same things. For each supplier, add up:

  • The unit price, and what is included in it: Ex Works, landed or delivered.
  • Freight, packing, duties and the cost of customs clearance, where they are not in the price.
  • The cost of holding inventory. It is often estimated at a significant percentage of the inventory's value each year: capital, storage, insurance, handling and the risk of obsolescence all count.
  • The cost of expediting when lead times slip, and of delay when they cannot be recovered.
  • Documentation, traceability and warranty terms.

Questions to ask any valve supplier

Where is the stock held, and who pays for it? What is the lead time for a valve built to order, and which configurations are held in stock? What is included in the price and what is added? What happens to the quotation if the schedule moves?

What a lean model does not mean

Lower overhead does not mean a lower standard of manufacture. The valves come from the same factory, under the same quality system, with the same API licences, testing and traceability. See API Monogram valves explained.

It is also a model for planned demand. A branch with stock on the shelf can ship the same week to a customer with a breakdown, and a factory-direct supplier is built for projects and stocking programs where the schedule is known in advance. The shorter and more predictable the factory lead time, the more of a buyer's demand can be planned rather than bought as an emergency: see valve lead times and inventory turns.

Supply from RANGER

RANGER supplies API 6D, API 600, API 609, API 602, API 594, API 6A and other valves, made by FZV. To compare a quotation with your current supply, send the figure numbers, quantities and required dates with your quote request. See also how RANGER supports orders.

Frequently asked questions

Why is factory-direct valve supply less expensive?

Because fewer facilities, staff and stock sit between the factory and the buyer. The costs of running branches and warehouses are recovered in the price of the valves they sell, so a supplier without them has less overhead to recover.

Does RANGER have warehouses in North America?

RANGER does not run a branch or warehouse network of its own in North America. Component stock is held at the factory, and local distribution partners provide inventory and parts support where customers want local stock.

Who benefits most from lower overhead?

Buyers of project orders, which are built to order and need no stock, and companies that hold inventory or pay others to hold it, because they can hold less when replenishment is faster.

Is a lean supplier lower quality?

No. Overhead and quality are separate. RANGER valves are manufactured by FZV, which holds API Monogram licences for API 6D, 600, 594, 602, 608, 609 and 6A products.

What should I compare when evaluating valve quotations?

The unit price and what it includes, freight and duties, the cost of holding inventory, the cost of expediting or delay, and the warranty and documentation terms.